From Dan... The previous tests sending And-Or Terms from the GAB to the TFW were done sometime between 27:29-JULY-2005. My notes from those tests are: Check the And-Or Term cable from the GAB by plugging it into the TFW. It looked OK on the scope, i.e. Strobe is OK, Gap is OK, and they are generating an And-Or Term on D15 of the cable which is asserted for Tick #7 and looks OK. The TFW could not lock onto the GAB signals. Look more and their Gap signal is only 16 Ticks long instead of the 17 Ticks long Sync Gap signals sent on the SCL. I do not know if the first or last ticks worth of the GAB Gap signal is missing. Mike worked on the GAB firmware and then its Sync Gap signal looked OK. Tested this by having GAB generate a L1 Term signal that was asserted for one tick on each turn. By hand setup TFW to look at this term from GAB and AND it with a Tick Select Term. Saw the correct operation when they were both asserted on the same tick or offset by +-1. For those tests the GAB And-Or Terms were just plugged into a normal block of 16 TFW And-Or Term inputs. This was not some special "alternate path" into the TFW.