RESULTS OF MARCH/APRIL 2004 INTEGRATION ======================================= TAB --> L2/L3 Data Transmission ------------------------------- o G-Link output of TAB tested for a few events - Successfully sent 3 events of test data from TAB to an existing L1Cal VRB (without requiring an SCL Init between events) - This test was limited to only a few events because this mode of running (without the VRB channel in the trigger configuration file) is not supported. o Next step - create a trigger configuration file so that data can be written to tape ADF Tests --------- o No further tests of the ADF were made in this round