************************************* INTEGRATION TEST SCHEDULE ************************************* o During March mini-shutdown: approx. 15-24 March ************************************* ADF TEST GOALS (from Dan Edmunds) ************************************* 1. Learn how to run the single channel SCLD card. So far Philippe and I have only worked with the ADF card itself. 2. Long duration Channel Link test. Make this as complicated as we can, e.g. all 3 copies of the ADF card output being received. I think that this is the one point that could possibly effect ADF-2 layout. Note that there are already some changes in this area of the layout, specifically: ADF-2 will have a row of GND pins between the 3 copies of its Channel Link output and between its Channel Link output and its SCLD input. I.E. it will implement what was the original plan for the layout of its P0 connector. The shield over its P0 connector will be Grounded and not floating as it is on ADF-1. 3. Capture some BLS signal with the ADF card. It will be during shutdown so this will only be a pulser signal but it is good to learn how to do this and practice doing it. 4. Have MSU people get more experience working with ADF-1 and the control software for it. So far we have only worked with it in the privacy of our office/lab. ************************************* TAB TEST GOALS ************************************* 1. Test transmission of data to L2/L3 using G-Link optical transmitter.