DØ Run IIb L1Cal TRR Agenda

Details: Version 1

26-27 August, 2005

Fermilab

Video: 82-72251 (82-R2BL1)


 
Times given below are for the talks themselves and are included as guidance for the presenters. Discussion will is expected to lengthen the clock time of each presentation by at least a factor of two.
 

 

Friday, 26-Aug-05

 
H.Evans Introduction & Overview
introduce the system and define all the terms
15'
 
A.Stone Infrastructure
racks, cabling, power, cooling...
20'
 
J.Benitez Analog Signals
tests of BLS to ADF signal quality w/ transistion system
15'
 
M.Mulhearn Digital Signals
BERs for ADF-to-TAB, TAB-to-GAB, TAB-to-L2/L3, TAB-to-CalTrk, GAB-to-TFW
not data quality checks
30'
 
H.Evans Algorithms: Hardware vs Simulation
comparison of what's in the TAB/GAB hardware with standalone simulator
15'
 
S.Lammers Data Quality
Results of Precision Readout vs Run IIb TTs vs Run IIa TTs
20'
 
P.Laurens Online Control
status of downloading, TCC interface, COOR...
15'
 
P.Renkel The Pulser System
how it works and how it will be used
10'
 
T.Adams Unpacker and Examines
where we stand on these
10'
 
H.Evans Online Monitoring
general scheme and what will be available
10'
 
L.Bagby Operational Readiness Clearance
what has been verified
15'
 
D.Edmunds Hardware Verification After Installation
how the hardware will be verified in situ
15'
 

 

Saturday, 27-Aug-05

 
All Further Discussion w/ Committee
answers to any homework questions
day


Last updated: 18-Aug-2005