DØ Run IIb L1Cal TRR AgendaDetails: Version 126-27 August, 2005FermilabVideo: 82-72251 (82-R2BL1) |
| Times given below are for the talks themselves and are included as guidance for the presenters. Discussion will is expected to lengthen the clock time of each presentation by at least a factor of two. | ||
Friday, 26-Aug-05 |
||
| H.Evans |
Introduction & Overview introduce the system and define all the terms |
15' |
| A.Stone |
Infrastructure racks, cabling, power, cooling... |
20' |
| J.Benitez |
Analog Signals tests of BLS to ADF signal quality w/ transistion system |
15' |
| M.Mulhearn |
Digital Signals BERs for ADF-to-TAB, TAB-to-GAB, TAB-to-L2/L3, TAB-to-CalTrk, GAB-to-TFW not data quality checks |
30' |
| H.Evans |
Algorithms: Hardware vs Simulation comparison of what's in the TAB/GAB hardware with standalone simulator |
15' |
| S.Lammers |
Data Quality Results of Precision Readout vs Run IIb TTs vs Run IIa TTs |
20' |
| P.Laurens |
Online Control status of downloading, TCC interface, COOR... |
15' |
| P.Renkel |
The Pulser System how it works and how it will be used |
10' |
| T.Adams |
Unpacker and Examines where we stand on these |
10' |
| H.Evans |
Online Monitoring general scheme and what will be available |
10' |
| L.Bagby |
Operational Readiness Clearance what has been verified |
15' |
| D.Edmunds |
Hardware Verification After Installation how the hardware will be verified in situ |
15' |
Saturday, 27-Aug-05 |
||
| All |
Further Discussion w/ Committee answers to any homework questions |
day |