RUN 2B L1CAL MEETING MINUTES 16 January, 2006 Present o Fermilab G.Ginther, S.Lammers, A.Stone o Indiana H.Evans o MSU M.Abolins, D.Edmunds, P.Laurens o UIC N.Varelas (apologies to those I couldn't see) Test Area Status ---------------- o Email report from Mike Mulhearn With the cabling done I have come back to work, and installed 3 TABs and 1 GAB and started bringing things back to life (I thought it best to start with 3 in case the new crate catches on fire or something!) The main result was to reproduce the test using the GAB BC10 and/or term to trigger the TAB/GAB readout, which worked perfectly. We have also restarted the TAB/GAB -> L2 tests which have detected a few improperly set header/trailer parameters. Philippe is preparing the code to setup the ADF for the full scale ADF->TAB channel map test. I will install the rest of the TABs on tuesday and begin the full-scale system tests! o New TAB firmware Sabine will test this as soon as Mike has done the ADF-to-TAB cabling tests o Unpacked data - Todd has noticed that the GAB event size changes even-by-event. This is being investigated. - Steve Beal has a first version of the Examine ready o Tevatron status this week (vacuum problems - warming up) - expectation is that this will take ~2 weeks - this should not accelerate the shutdown (zebra mussels are the issue) . note: will want current L1Cal connected until the beampipe is pulled ("welder" studies) - aperture studies will continue - try to improve pbar stacking o General information - another PMG has been requested . probably Feb.10 - spokes would like a final snapshot of project at ADMs . probably Feb.3 and/or 10