| Construction of new WLS for the BPCs | Design WLS | JS |
| Produce WLS | HERA | |
| Test WLS | MH | |
| BPC south disassembly | Not needed | |
| Shave off Tungsten plate, Frame modification. | JH, HERA | |
| BPC reassemble | Assembly jigs, stand. | JH+all |
| Photomultipliers | Inventory (PMTs and bases) | |
| Definition of PMT testing procedure, Inventory of equipment needed. Simple DAQ setup in the lab. | XL, KL | |
|
|
||
| Stand that holds BPCs | Construction, Installation | HERA machine group |
| Collimator Design | MC studies, Construction, Installation. | SP, XL |
| Magnet | Installation, B field measurements. | HERA, SP |
| Proton pipe modification | HERA | |
| Proton pipe window | HERA, SP | |
| Helium Bag | Designed for minimum e crossing. | HERA, SP |
| Alignment and Surveying | HERA, SP | |
|
|
||
| PMT calibrations | LED system (setup and test the system) | MH, SP |
| Energy scale calibration using the spectrum endpoint. | MH, SP | |
| Arrange for the LED pulse to come to the Tunnel from the hole. | MH, SP | |
|
|
||
| Cracow RO Electronics | SP | |
| High Voltage | ||
| Power PC | SP, MH | |
| Data Format | SP, MH |
| System Software | FPGA programming | MH, SP |
| VME module programming | MH, SP | |
| Slow Controls | MH, SP | |
| PC Software | Algorithms to calculate Lumi | MH, SP |
| Offline Software | Monte Carlo | SP, MH |
| Acceptance Calculation using MC | SP, MH | |
| Calibration | All | |
| Background Studies | All | |
| Pile-up Correctrions | All |