ATLAS LAr FEB Documentation, Nevis Labs

FEB production

Link to the FEB Production Database.

Link to the FEB Production Readiness Review (PRR).

Link to FEB component data sheets.

Link to FEB assembly QA/QC reports (PRR).

Link to results of ongoing FEB accelerated lifetime test.

FEB documents

Paper submitted for publication to JINST describing the Design and Implementation of the FEB.

Note describing the FEB Output Data Format.

Noise results from May 8/2004 with the FEBs connected to the EMBarrel calorimeter for the first time, in Building 180.

Note describing the FEB, in pdf , and MS Word formats.

Note describing the proposed FEB Testing procedures to be used during FEB production.

Note describing the proposed FEB HASS Testing procedures to be used during FEB production.

Figure showing voltage regulator distribution and monitoring on the ATLAS FEB (obsolete)

FEB Version 1.4 schematics pdf (27 May 2003)

FEB Version 1.5 schematics pdf (8 December 2003)

FEB Version 2.0 schematics pdf (29 March 2005)

FEB Version 2.0 layout file (PADS format)

FEB drawings

Drawing showing a cross-section through the 10 layers of the FEB.

Drawing showing a block diagram of the FEB.

Color drawing showing component placement on the top layer along with several layers of routing of the the ATLAS FEB layout.

Color drawing showing component placement on the bottom layer of the ATLAS FEB layout.

FEB photographs

Color photograph of installation of first FEB on EMBarrel.

Color photograph of installed and commissioned crate of FEBs on EMBarrel.

Color photographs of top side and bottom side of version 1.4 ATLAS FEB prototype.

Color photograph of previous version ATLAS FEB prototype, albeit still missing negative voltage regulators.

Color photograph of previous version ATLAS FEB prototype, albeit still missing negative voltage regulators.

Color photograph of close-up of optical link, as implemented on ATLAS FEB prototype.

File with component placement on top side of FEB along with mounting holes for cooling plates, in dxf format and dwg format.

File with component placement on bottom side of FEB, in dxf format and dwg format (mounting holes NOT shown on these figures).

Directory of photos of HASS tests on FEBs.

Directory of photos from the "Completion of FEB Production" Party held at Nevis Labs on Nov. 29/2005.

Directory of transparencies of some talks given about the FEBs.

3-dimensional CAD files of FEB, including component height information

FEB Version 1.5 file with top side of FEB, in dxf format and dwg format.

FEB Version 1.5 file with bottom side of FEB, in dxf format and dwg format.

FEB Version 1.4 file with both sides of FEB, in dxf format and dwg format.

FEB Version 1.4 file with top side of FEB, in dxf format and dwg format.

FEB Version 1.4 file with bottom side of FEB, in dxf format and dwg format.

OBSOLETE File for top side of PREVIOUS VERSION of FEB, in dxf format and dwg format.

OBSOLETE File for bottom side of PREVIOUS VERSION of FEB, in dxf format and dwg format.