L1Cal Home Page

General
RunIIb Trigger
Documents
Meetings
Data
Operations

Design
Hardware
Algorithms
Columbia
MSU
Saclay
UIC

Run IIa
L1Cal
Framework
   L1Cal

DØ Run IIb L1Cal

Hardware

Overview Testing Online
ADF Cabling TAB/GAB
Splitter Test W'Form Gen Latency
Installation Tevatron Beam Other Hardware



System Overview

Photo Gallery 10-Dec-04
L1 Cal System Diagrams
o Block: (doc | pdf)
   - old (doc | pdf | jpg)
o Rack Layout
o Crate Layout: (pdf | ppt)
   - (old)

27-Apr-05
10-Mar-03
18-Aug-04
27-Apr-05
08-Oct-03
Sliding Windows Algorithms 17-Jan-05
Trigger Terms in Run IIb 22-Oct-04
Calorimeter Geometry:
o Coordinate Ssytem (pdf | gif)
o Cell & TT eta's (pdf | gif)
o TT Mapping (ieta,iphi-->eta,phi)
20-Oct-06

Online System

Online System Diagram: (pdf | ppt) 27-Apr-05
Trigger Resource Programming (COOR) 30-Aug-05
Monitoring
o Monitoring in TCC (v.2 A.Roe 29-Sep-05)
o TAB/GAB (30-Aug-05)
29-Sep-05

Analog Digital Filter (ADF)

Saclay Hardware Web Page  
MSU Hardware Web Page  

Trigger & Global Algorithm Boards
(TAB, GAB & VME/SCL)

Columbia Hardware Web Page  

Analog Splitter

Photo of the Splitter installed on a Run IIa CTFE board 07-Feb-03
Splitter Description
o How many we need (04-Mar-04 meeting)
 
Splitter Data:
o Dan Edmunds' Trigger Pickoff Data
    (readme)

12-Jun-03

Cabling in the L1Cal

Cabling in MCH1:
o Alan Stone's L1Cal page
 
BLS-ADF-TAB Transition Ssytem
o Jorge's Testing Page
o Fermilab EED web page
o Transition System Note (DØNote 4692)
   - v1 v.1 (24-Nov-04)
   - Mario's talk (04-Nov-04)
o 3M Pleated Foil Cable spec's
o BLS to ADF Cable Extension spec's
    - D.Edmunds (10-Apr-04)
29-Jul-05
ADF to TAB Cabling
o Connection Diagrams (doc | jpg | pdf)
o Cable & Connector Spec's and Diagrams
o Cable bundling (A.Stone 14-Oct-05)
14-Oct-05
TAB to GAB Data Transmission 11-Apr-04
GAB to TFW connector pinouts (C. Johnson) 05-Apr-04

Test Waveform Generator

Web page at Fermilab  

Latency Estimates

Final latency report (pdf) 03-Mar-06
Latency Measurements (wrt current L1A)
all meas for full readout chain
o L1Cal to TFW: -6 BCs
o L1Cal to CalTrack to L1Accept: +190 ns
o current L1A = 3300 ns after collision
01-Nov-05
Latency Spreadsheet v3.1 (html | xls) 13-Jun-05
Latency Spreadsheet 2 26-Oct-04
Latency Spreadsheet 1 (xls | pdf) 03-Sep-02
Muon Pipeline Depth Increase to accommodate L1Cal-to-L1Cal-Track latency
note by B.Baldin, T.Fitzpatrick, S.Hansen
01-Aug-02

System Integration & Installation

Integration/Installation Web Page 05-May-03

Tevatron Beam Documents

Tevatron Web Pages
o Beams Division
o Run II
o Luminosity Upgrade Group
 
Run IIa Tevatron Bunch Structure 21-Mar-03

Other Documents of Interest

Fermilab Cards
o Serial Command Link Receiver (SCLR)
o VME Readout Buffer (VRB)
o VRB Transition Module (VTM)
 
Tevatron Beam Structure
o Usage of each of the 159 ticks in an accelerator turn for 36x36 bunch running (txt | pdf)
 
DØ SCL Description 24-Apr-97
L1Muon Serial Link Daughter Board
o SLDB xmitter (updated)
23-Oct-03
Run 2a And-Or Terms
o Target Design
o Calorimeter Terms
 


Last updated: 26-Jun-07