DØ Run IIb L1Cal

Operations & Installation

Selcuk's Operations Page
Online Logbook   Noise Studies
Infrastructure Integration Installation



Noise Studies

Philippe's Noise Study Summary Dec-06

Infrastructure

Cabling  
Rack & Crate Layout in MCH1
o Alan Stone's L1Cal page
o Rack Layout Diagram (18-Aug-04)
   - J.Foglesong
o Crates Diagram (08-Oct-03)
   - P.Laurens
 

Integration Tests

Online Logbook
o click on Trigger/Log
 
Integration & Installation Blog
o the forum for integration planning discussions
 
Prototype Integration II:
o Results (05-May-04)
o Original Goals (04-Mar-04 meeting)
Mar/Apr-04
Prototype Integration I:
o Results (16-Oct-03 meeting)
o Original Goals (01-May-03 meeting)
Oct-03

Installation

Stable Operations Strategy 10-Oct-05
Installation Overviews:
o Overview of Strategy (05-May-04)
o talk by Hal: ppt | pdf (26-Feb-04)
o latest installation schedule (soon)
 
Pre-Installation Strategy:
o Run Readiness Verification (08-Apr-04 meeting)
o Responsibilities
 